Scheduled Outage Notice for: Yigo: Wusstig Road Area, Thursday, 27 May 2021

For Release: On Receipt
End Date: Thursday, 27 May 2021 @ 3:00 PM
 
The Guam Power Authority advises that a power outage is scheduled as follows:
 
Thursday, 27 May 2021
From 09:00 AM to 3:00 PM (6 hours)
 
The area(s) affected include:  Yigo:  Wusstig Road areas including Chalan Okso, Chalan Kaskahu, Chalan Dinana, Kayen Pumeska, Kayen Kumpaire, Kayen Umasodda
 
REASON: GPA crews will be upgrading power lines and poles in the area to improve power quality and reliability.
 
Customers using backup generators, please ensure your main breaker is in the OPEN position to ensure the safety of the GPA crews working on the lines.
 
GPA regrets the inconvenience caused to customers in these areas, but the outage is necessary as a safety precaution while the GPA crews are performing this work.
 
Your cooperation is appreciated.
 
# # #
 
Editor’s note: customers may view this power outage information on GPA’s Facebook page and GPA Instagram

Monday, May 17, 2021

Scheduled Outage Notice for: Yona Area, 19 May 2021

For Release: On Receipt
End Date: Wednesday, 19 May 2021 @ 2:30 PM
 
The Guam Power Authority advises that a power outage is scheduled as follows:
 
Wednesday, 19 May 2021
From 08:30 AM to 2:30 PM (6 hours)
 
The area(s) affected include:  Yona:  all customers southbound after Ylig Bridge to the Route 4 Cross-Island Road intersection, including Chalan Seminaru Road. This also includes GWA WBP-5.
 
There will be a brief interruption of power at 2:00 PM.
 
Customers affected by the thirty (30) minute interruption will be:
 
Location:  Yona:  all customers located in Pulantant, from Balajadia Road southbound to Ylig Bridge
 
REASON: GPA crews will be performing maintenance work to replace pole top hardware(s), to improve power quality and reliability.
 
Customers using backup generators, please ensure your main breaker is in the OPEN position to ensure the safety of the GPA crews working on the lines.
 
GPA regrets the inconvenience caused to customers in these areas, but the outage is necessary as a safety precaution while the GPA crews are performing this work.
 
Your cooperation is appreciated.
 
# # #
 
Editor’s note: customers may view this power outage information at GPA’s Facebook page and GPA Instagram
 

 

 

Scheduled Outage Notice for: Santa Rita/Apra Substation to Calvo’s area on Route 17, Cross Island Road, 20 May 2021

For Release: On Receipt
End Date: Thursday, 20 May 2021 @ 3:00 PM
 
The Guam Power Authority advises that a power outage is scheduled as follows:
 
Thursday, 20 May 2021
From 10:00am – 3:00pm (5 hours)
 
The area(s) affected include:  Santa Rita/Apra Substation to Calvo’s area on Route 17, Cross Island Road:  Felix T. Dydasco Street, Juan Cruz Drive, Vicente Borja Drive, Felix Babauta Drive, Felix Pangelinan Drive, Ignacio Cruz Drive, Felix Dydasco Drive, J. Kindo Avenue, Joaquin Diaz Drive, Dr. Iseke Street, Apra Vista Court, Discansagon Drive, Bishop Baumgartner Drive, Jose Santos Street and all customers within the areas.
 
REASON: GPA crews will be conducting vegetation management including trimming and removing overgrown vegetation in contact with the power lines, to improve power quality and reliability.
 
Customers using backup generators, please ensure your main breaker is in the OPEN position to ensure the safety of the GPA crews working on the lines.
 
GPA regrets the inconvenience caused to customers in these areas, but the outage is necessary as a safety precaution while the GPA crews are performing this work.
 
Your cooperation is appreciated.
 
# # #
 
Editor’s note: customers may view this power outage information on GPA’s Facebook page and GPA Instagram
 

Friday, May 7, 2021

Scheduled Outage Notice for: Yona Area, 12 May 2021

For Release: On Receipt
End Date: Wednesday, 12 May 2021 @ 2:30 PM
 
The Guam Power Authority advises that a power outage is scheduled as follows:
 
Wednesday, 12 May 2021
From 08:30 AM to 2:30 PM (6 hours)
 
The area(s) affected include:  Yona:  all customers southbound after Ylig Bridge to the Route 4 Cross-Island Road intersection. Also to include GWA WBP-5
 
There will be a brief interruption of power at 2:00 PM.
 
Customers affected by the thirty (30) minute interruption will be:
 
Location:  Yona:  all customers located in Pulantant, from Balajadia Road southbound to Ylig Bridge
 
REASON: GPA crews will be performing maintenance work to replace pole top hardware(s), to improve power quality and reliability.
 
Customers using backup generators, please ensure your main breaker is in the OPEN position to ensure the safety of the GPA crews working on the lines.
 
GPA regrets the inconvenience caused to customers in these areas, but the outage is necessary as a safety precaution while the GPA crews are performing this work.
 
Your cooperation is appreciated.
 
# # #
 
 
Editor’s note: customers may view this power outage information on GPA’s Facebook page and GPA Instagram
 
 

Scheduled Outage Notice for: Yigo Area, 13 May 2021

 
For Release: On Receipt
End Date: Thursday, 13 May 2021 @ 3:00 PM
 
The Guam Power Authority advises that a power outage is scheduled as follows:
 
Thursday, 13 May 2021
From 09:00 AM to 3:00 PM (6 hours)
 
The area(s) affected include:  Yigo:  all customers northbound after Chalan Ramirez to the front gate of Andersen Air Force Base
 
There will be a brief interruption of power at 2:30 PM.
 
Customers affected by the thirty (30) minute interruption will be:
 
Location:  Yigo:  all customers from Ritidian Mart to Chalan Ramirez
 
REASON: GPA crews will be performing maintenance work to replace pole top hardware(s), to improve power quality and reliability.
 
Customers using backup generators, please ensure your main breaker is in the OPEN position to ensure the safety of the GPA crews working on the lines.
 
GPA regrets the inconvenience caused to customers in these areas, but the outage is necessary as a safety precaution while the GPA crews are performing this work.
 
Your cooperation is appreciated.
 
# # #
 
Editor’s note:
customers may view this power outage information on GPA’s Facebook page and GPA Instagram

Scheduled Outage Notice for: Yona Area, 12 May 2021

For Release: On Receipt
End Date: Wednesday, 12 May @ 12:00 PM NOON
 
The Guam Power Authority advises that a power outage is scheduled as follows:
 
Wednesday, 12 May 2021
From: 9:00 AM – 12:00 PM Noon (3 hours)
 
The area(s) affected include:  Yona:  Sefarin Mafnas Court, the Mayor’s Office and Day Care area
 
REASON:  GPA crews will be performing repairs and maintenance work, which will improve power quality and reliability.
 
Customers using backup generators, please ensure your main breaker is in the OPEN position to ensure the safety of the GPA crews working on the lines.
 
GPA regrets the inconvenience caused to customers in these areas, but the outage is necessary as a safety precaution while the GPA crews are performing this work.
 
Your cooperation is appreciated.
 
# # #
 
Editor’s note:
Customers, may view this power outage information on GPA’s Facebook page and GPA Instagram

Monday, April 26, 2021

Scheduled Outage Notice for: Pagat, Mangilao Area, 28 April 2021

For Release: On Receipt
End Date: Wednesday, 28 April 2021 @ 1:00 PM
 
GPA ANNOUNCES SCHEDULED POWER OUTAGE – Pagat, Mangilao Area
 
The Guam Power Authority advises that a power outage is scheduled as follows:
 
Wednesday, 28 April 2021
From: 8:30 AM – 1:00 PM (4.5 hours)
 
The area(s) affected include:  Pagat, Mangilao: customers on Fausto Pangelinan Street, off Route 15
 
REASON: To provide contractor safety clearance for crane operation(s) near overhead power lines.
 
Customers using backup generators, please ensure your main breaker is in the OPEN position to ensure the safety of the GPA and Contractor crews working on and near the lines.
 
GPA regrets the inconvenience caused to customers in these areas, but the outage is necessary as a safety precaution while contractors are working.
 
Your cooperation is appreciated.
 
# # #
 
Editor’s note: customers may view this power outage information on GPA’s Facebook page and GPA Instagram
 
 

Scheduled Outage Notice for Route 4 Area: Ipan, Talofofo, CCP Golf Course Area, 28 April 2021

For Release: On Receipt
End Date: Wednesday, 28 April 2021 @ 2:30 PM
 
GPA ANNOUNCES SCHEDULED POWER OUTAGE
Route 4 Area: Ipan, Talofofo, CCP Golf Course Area
 
The Guam Power Authority advises that a power outage is scheduled as follows:
 
Wednesday, 28 April 2021
From: 9:00 AM – 2:30 PM (5.5 hours)
 
The area(s) affected include:  Route 4 Ipan, Talofofo, CCP Golf Course area
 
REASON: GPA crews will be performing maintenance work changing out and/or removing power pole hardware(s), wooden power poles, to improve power quality and reliability.
 
In addition, there will be two (2) 30-minute interruptions of service for the following areas beginning once at 09:00 AM and again at 2:30 PM:

Location:  customers near and around the Jones Beach Resort to Jeff’s Pirates Cove
 
Customers using backup generators, please ensure your main breaker is in the OPEN position to ensure the safety of the GPA crews working on the lines.
 
GPA regrets the inconvenience caused to customers in these areas, but the outage is necessary as a safety precaution while the GPA crews are performing this work.
 
Your cooperation is appreciated.
 
# # #
 
Editor’s note:
customers may view this power outage information on GPA’s Facebook page and GPA Instagram

Thursday, April 22, 2021

Scheduled Outage Notice for: Mangilao Area, 27 April 2021

For Release: On Receipt
End Date: Tuesday, 27 April 2021 @ 2:30 PM
 
The Guam Power Authority advises that a power outage is scheduled as follows:
 
Tuesday, 27 April 2021
From: 8:30 AM – 2:30 PM (6 hours)
 
The area(s) affected include:  Mangilao:  Atanacio Street and customers within the surrounding area.
 
REASON: GPA crews will be upgrading existing power poles and converting and relocating hardware(s) to support new Underground equipment to improve power quality.
 
Customers using backup generators, please ensure your main breaker is in the OPEN position to ensure the safety of the GPA crews working on the lines.
 
GPA regrets the inconvenience caused to customers in these areas, but the outage is necessary as a safety precaution while the GPA crews are performing this work.
 
Your cooperation is appreciated.
 
# # #
 
Editor’s note: Customers, may view this power outage information on GPA’s Facebook page and GPA Instagram
 

Scheduled Outage Notice for: Tamuning Area, 27 April 2021

For Release: On Receipt
End Date: Tuesday, 27 April 2021 @ 2:00 PM
 
The Guam Power Authority advises that there will be a scheduled power outage and road closure as follows: 
 
Tuesday, 27 April 2021
From 9:00 AM to 2:00 PM (5 hours)
 
The area(s) affected include:  Tamuning: Tun Jose Salas Street, parts of Tan Antonia Camacho Street, Guerrero Drive, Tun Joaquin Guerrero Drive, L&C, Matias Street and customers in the surrounding area.
 
REASON: GPA crews will be performing maintenance work on power lines to improve reliability and power quality.
 
Customers using backup generators, please ensure your main breaker is in the OPEN position to ensure the safety of the GPA crews working on the lines.
 
GPA regrets the inconvenience caused to customers in these areas, but the outage is necessary as a safety precaution while the GPA crews are performing this work.
 
Your cooperation is appreciated.
 
# # #
 
Editor’s note: customers may view this power outage information on GPA’s Facebook page and GPA Instagram

Monday, April 19, 2021

Scheduled Outage Notice for: Route 15 - Mangilao Area, 22 April 2021

For Release: On Receipt
End Date: Thursday, 22 April 2021 @ 3:00 PM
 
The Guam Power Authority advises that a power outage is scheduled as follows:
 
Thursday, 22 April 2021
From: 9:00 AM – 3:00 PM (6 hours)
 
The area(s) affected include:  Mangilao, Route 15: customers northbound after Sergio Cruz Road to the Marbo Cave entrance
 
REASON: GPA crews will be performing maintenance work to improve power quality and reliability.
 
In addition, there will be two (2) 30-minute interruptions of service for the following areas beginning once at 09:00 AM and again at 2:30 PM:

Location:  customers along Route 15 from the Route 10/Route 15 Intersection to the Pagat Substation
 
Customers using backup generators, please ensure your main breaker is in the OPEN position to ensure the safety of the GPA crews working on the lines.
 
GPA regrets the inconvenience caused to customers in these areas, but the outage is necessary as a safety precaution while the GPA crews are performing this work.
 
Your cooperation is appreciated.
 
# # #
 
Editor’s note: customers may view this power outage information on GPA’s Facebook page and GPA Instagram

Thursday, April 15, 2021

Scheduled Outage Notice for: Dededo/Route 3 Area, 22 April 2021

For Release: On Receipt
End Date: Thursday, 22 April 2021 @ 2:30 PM
 
The Guam Power Authority advises that there will be a scheduled power outage and road closure as follows: 
 
Thursday, 22 April 2021
From 8:30 AM to 2:30 PM (6 hours)
 
The area(s) affected include:  Route 3 Dededo, Chalan Inda and customers in the surrounding area.
 
REASON: GPA Line crews will be replacing and installing concrete poles; and removing and installing new overhead power line wires to improve power quality and reliability of the islandwide power system.
 
Customers using backup generators, please ensure your main breaker is in the OPEN position to ensure the safety of the GPA crews working on the lines.
 
GPA regrets the inconvenience caused to customers in these areas, but the outage is necessary as a safety precaution while the GPA crews are performing this work.
 
Your cooperation is appreciated.
 
# # #
 
Editor’s note: customers may view this power outage information on GPA’s Facebook page and GPA Instagram

 

Wednesday, April 14, 2021

Scheduled Outage Notice for: Near Toto-Canada Road, 21 April 2021

For Release: On Receipt
End Date: Wednesday, 21 April 2021 @ 12:30 PM
 
The Guam Power Authority advises that there will be a scheduled power outage as follows: 
 
Wednesday, 21 April 2021
From 8:30 AM to 12:30 PM (4 hours)
 
The area(s) affected include:  Aragon Street, near the Toto-Canada Road; Ironwood Del Mar Villas Phase I Office building and existing customers in buildings 1 through 6; and customers in the surrounding area.
 
REASON: GPA Underground crews will energize new switchgear, adding to existing equipment that will service and support additional housing units.
 
Customers using backup generators, please ensure your main breaker is in the OPEN position to ensure the safety of the GPA crews working on the lines.
 
GPA regrets the inconvenience caused to customers in these areas, but the outage is necessary as a safety precaution while the GPA crews are performing this work.
 
Your cooperation is appreciated.
 
# # #
 
Editor’s note: customers may view this power outage information on GPA’s Facebook page and GPA Instagram

  

Monday, April 12, 2021

Scheduled Outage Notice for: Inalahan Area, 15 April 2021

For Release: On Receipt
End Date: Thursday, 15 April 2021 @ 3:00 PM
 
The Guam Power Authority advises that a power outage is scheduled as follows:
 
Thursday, 15 April 2021
From: 9:00 AM – 3:00 PM (6 hours)
 
The area(s) affected include:  Inalahan: all customers from Tun Felipe Meno Drive and southbound to Leon Guerrero Beach
 
REASON: GPA crews will be performing maintenance work to improve power quality and reliability.
 
In addition, there will be two (2) 30-minute interruptions of service for the following areas beginning once at 09:00 AM and again at 2:30 PM:


Location:  customers after Leon Guerrero Beach and southbound to the Sailboat Monument
 
Customers using backup generators, please ensure your main breaker is in the OPEN position to ensure the safety of the GPA crews working on the lines.
 
GPA regrets the inconvenience caused to customers in these areas, but the outage is necessary as a safety precaution while the GPA crews are performing this work.
 
Your cooperation is appreciated.
 
# # #
 
Editor’s note: customers may view this power outage information on GPA’s Facebook page and GPA Instagram

Sunday, April 11, 2021

Scheduled Outage Notice and Road Closure Advisory for: Tamuning Area, 14 April 2021

For Release: On Receipt
End Date: Wednesday, 14 April 2021 @ 2:30 PM
  
The Guam Power Authority advises that there will be a scheduled power outage and road closure as follows:

Wednesday, 14 April 2021
From 8:30 AM to 2:30 PM (6 hours)
 
The area(s) affected include:  Tamuning: Tun Josen Fejeran Street and Jose Crisostomo Street.
 
REASON: GPA Line crews will be performing maintenance work, to include trimming vegetation on power lines to improve power quality and reliability of the island wide power system.
 
Customers using backup generators, please ensure your main breaker is in the OPEN position to ensure the safety of the GPA crews working on the lines.
 
GPA regrets the inconvenience caused to customers in these areas, but the outage is necessary as a safety precaution while the GPA crews are performing this work.
 
Your cooperation is appreciated.
 
# # #
 
Editor’s note: customers may view this power outage information on GPA’s Facebook page and GPA Instagram

Wednesday, April 7, 2021

Scheduled Outage Notice for: Yigo Area, 13 April 2021

For Release: On Receipt
End Date: Tuesday, 13 April 2021 @ 2:30 PM
 
The Guam Power Authority advises that a power outage is scheduled as follows:
 
Tuesday, 13 April 2021
From:  8:30 AM – 2:30 PM (6 hours)
 
The area(s) affected include:  Yigo – customers located within the area of Tong Street, Chalan Felix Remedio Street, GWA SD-7
 
REASON: GPA crews will be performing maintenance work, to improve power quality and reliability.
 
Customers using backup generators, please ensure your main breaker is in the OPEN position to ensure the safety of the GPA crews working on the lines.
 
GPA regrets the inconvenience caused to customers in these areas, but the outage is necessary as a safety precaution while the GPA crews are performing this work.
 
Your cooperation is appreciated.
 
# # #
 
Editor’s note:
customers may view this power outage information GPA’s Facebook page and GPA Instagram

Friday, April 2, 2021

Scheduled Outage Notice for: Mangilao Area, 06 April 2021


For Release: On Receipt
End Date: Tuesday, 6 April 2021 @ 3:00 PM
 
The Guam Power Authority advises that a power outage is scheduled as follows:
 
Tuesday, 06 April 2021
From:  9:00 AM – 3:00 PM (6 hours)
 
The area(s) affected include:  Mangilao– customers located within the areas of Tun Kiko Feja Street and customers directly across Matsumiya Street Route 15
 
REASON: GPA crews will be performing maintenance work, to improve power quality and reliability.
 
Customers using backup generators, please ensure your main breaker is in the OPEN position to ensure the safety of the GPA crews working on the lines.
 
GPA regrets the inconvenience caused to customers in these areas, but the outage is necessary as a safety precaution while the GPA crews are performing this work.
 
Your cooperation is appreciated.
 
# # #
 
Editor’s note:
customers may view this power outage information on GPA’s Facebook page and GPA Instagram

Scheduled Outage Notice for: Merizo Area, 08 April 2021

For Release: On Receipt
End Date: Thursday, 8 April 2021 @ 3:00 PM
 
The Guam Power Authority advises that a power outage is scheduled as follows:
 
Thursday, 08 April 2021
From:  9:00 AM – 3:00 PM (6 hours)
 
The area(s) affected include:  Merizo– customers located within the areas of the sail boat monument to Arriola’s Beach
 
REASON: GPA crews will be performing maintenance work, to improve power quality and reliability.
 
Customers using backup generators, please ensure your main breaker is in the OPEN position to ensure the safety of the GPA crews working on the lines.
 
GPA regrets the inconvenience caused to customers in these areas, but the outage is necessary as a safety precaution while the GPA crews are performing this work.
 
Your cooperation is appreciated.
 
# # #
 
Editor’s note:
customers may view this power outage information on GPA’s Facebook page and GPA Instagram

Monday, March 29, 2021

Scheduled Outage Notice for: Toto/Barrigada Area, Wednesday, 7 April 2021

For Release: On Receipt
End Date: Wednesday, 7 April 2021 @ 2:30 PM
 
The Guam Power Authority advises that a power outage is scheduled as follows:
 
Wednesday, 7 April 2021
From:  8:30 AM – 2:30 PM (6 hours)
 
The area(s) affected include:  Toto/Barrigada – Ramirez Way, Ramirez Lane, Mobil Gas Station, Shell Gas Station and customers after Kina Court towards Route 8.
 
In addition, there will be two (2) 30-minute interruptions of service for the following areas beginning at 8:30 AM and again at 2:00 PM:  Ada Lane in Roy T. Damian Street and out towards Route 8, Deda Circle, Camacho Street, Machaute Street, Harvest Christian School, Untalan Torres Court, Toto Gardens and Kina Court.
 
REASON: GPA crews will be performing maintenance work to improve power quality and reliability.
 
Customers using backup generators, please ensure your main breaker is in the OPEN position to ensure the safety of the GPA crews working on the lines.
 
GPA regrets the inconvenience caused to customers in these areas, but the outage is necessary as a safety precaution while the GPA crews are performing this work.
 
Your cooperation is appreciated.
 
# # #
 
Editor’s note:
customers may view this power outage information on GPA’s Facebook page and GPA Instagram

Tuesday, March 23, 2021

Scheduled Outage Notice for: Merizo Area, 24 March 2021

Re: Scheduled Power Outage Notice
For Release: On Receipt
End Date: Wednesday, 24 March 2021 @ 2:30 PM
 
The Guam Power Authority advises that a power outage is scheduled as follows:
 
Wednesday, 24 March 2021
From:  9:00 AM – 2:30 PM (5.5 hours)
 
The area(s) affected include:  Merizo– customers located on Espinosa Street, after the GWA/GPA Pump Station #14
 
REASON: GPA crews will be clearing overgrown vegetation on primary power lines, which will improve power quality and reliability.
 
Customers using backup generators, please ensure your main breaker is in the OPEN position to ensure the safety of the GPA crews working on the lines.
 
GPA regrets the inconvenience caused to customers in these areas, but the outage is necessary as a safety precaution while the GPA crews are performing this work.
 
Your cooperation is appreciated.
 
# # #
 
Editor’s note:
customers may view this power outage information on GPA’s Facebook page.

Monday, March 22, 2021

Scheduled Outage Notice for: Piti Area, 27 March 2021

For Release: On Receipt
End Date: Saturday, 27 March 2021 @ 7:00 PM
 
The Guam Power Authority advises that a power outage is scheduled as follows:
 
Saturday, 27 March 2021
From: 4:30 PM – 7:00 PM (2.5 hours)
 
The area(s) affected include:  Piti – all customers located on Haggan Street, Turner Road, Piti
 
REASON: GPA crews will be performing maintenance work to improve power quality and reliability.
 
Customers using backup generators, please ensure your main breaker is in the OPEN position to ensure the safety of the GPA crews working on the lines.
 
GPA regrets the inconvenience caused to customers in these areas, but the outage is necessary as a safety precaution while the GPA crews are performing this work.
 
Your cooperation is appreciated.
 
# # #
 
Editor’s note:
customers may view this power outage information on GPA’s Facebook page.

Scheduled Outage Notice for: Area in Inarajan / with Traffic Advisory 25 March 2021


Re: Scheduled Power Outage Notice
For Release: On Receipt
End Date: Thursday, 25 March 2021 @ 3:00 PM
 
The Guam Power Authority advises that a power outage is scheduled as follows:
 
Thursday, 25 March 2021
From: 09:00 AM – 3:00 PM (6 hours)
 
The area(s) affected include:  Inarajan - customers from the Ija Subdivision and southbound to Tun Felipe Meno Drive, (As-Qyede Lane)
 
Traffic Advisory:  South Bound Route 4 Lane will be closed starting from Lada Lane to Tun Felipe Meno Drive.  GPA personnel will assist with traffic control in that area.
 
REASON: GPA crews will be performing maintenance work to improve power quality and reliability.
 
Customers using backup generators, please ensure your main breaker is in the OPEN position to ensure the safety of the GPA crews working on the lines.
 
GPA regrets the inconvenience caused to customers in these areas, but the outage is necessary as a safety precaution while the GPA crews are performing this work.
 
Your cooperation is appreciated.
 
# # #
 
Editor’s note:
customers may view this power outage information on GPA’s Facebook page.

Thursday, March 18, 2021

Scheduled Outage Notice for: Ordot, Chalan Famha Area, 25 March 2021

For Release: On Receipt
End Date: Thursday, 25 March 2021 @ 2:00 PM
 
The Guam Power Authority advises that a power outage is scheduled as follows:
 
Thursday, 25 March 2021
From: 9:00 AM – 2:00 PM (5 hours)
 
The area(s) affected include: Ordot:  all customers in the Chalan Famha area.
 
REASON: GPA crews will be performing maintenance work to improve power quality and reliability.
 
Customers using backup generators, please ensure your main breaker is in the OPEN position to ensure the safety of the GPA crews working on the lines.
 
GPA regrets the inconvenience caused to customers in these areas, but the outage is necessary as a safety precaution while the GPA crews are performing this work.
 
Your cooperation is appreciated.
 
# # #
 
Editor’s note:
customers may view this power outage information on GPA’s Facebook page.

Friday, March 12, 2021

Scheduled Outage Notice for: Area in Inarajan Thursday, 18 March 2021

For Release: On Receipt
End Date: Thursday, 18 March 2021 @ 3:00 PM
 
The Guam Power Authority advises that a power outage is scheduled as follows:
 
Thursday, 18 March 2021
From: 09:00 AM – 3:00 PM (6 hours)
 
The area(s) affected include:  Inarajan - customers from the Ija Subdivision and southbound to Tun Felipe Meno Drive, (As-Qyede Lane)
 
REASON: GPA crews will be performing maintenance work to improve power quality and reliability.
 
Customers using backup generators, please ensure your main breaker is in the OPEN position to ensure the safety of the GPA crews working on the lines.
 
GPA regrets the inconvenience caused to customers in these areas, but the outage is necessary as a safety precaution while the GPA crews are performing this work.
 
Your cooperation is appreciated.
 
# # #
 
Editor’s note: customers may view this power outage information on GPA’s Facebook page

Wednesday, March 10, 2021

GPA Road Closure Advisory for: Tamuning Area - Wednesday, 10 March 2021

Road Closure Advisory for: Tamuning Area
For Release: On Receipt
End Date: Wednesday, 10 March 2021 @ 2:00 PM
  
The Guam Power Authority advises that there will be a secondary road closure today, Wednesday – 10 March 2021 from 09:00AM to 2:00PM (5 hours):
 
The area(s) affected include:  Tamuning: Tun Josen Fejeran Street (located near the Ran-Care Building in Tamuning)
 
REASON:  The outage is necessary as GPA Line crews will be trimming vegetation and installing hardware on power lines in preparation for future additional maintenance work, to be announced separately.
 
This power utility work is essential to support power quality and reliability of the islandwide power system.
 
Customers using backup generators, please ensure your main breaker is in the OPEN position to ensure the safety of the GPA crews working on the lines.
 
GPA regrets the inconvenience caused to customers in these areas, but the outage is necessary as a safety precaution while the GPA crews are performing this work.
 
Your cooperation is appreciated.
 
# # #
 
 
Editor’s note:
customers may view this Road Closure Advisory information on GPA’s Facebook page



 

 

Editor’s note: customers may view this Road Closure Advisory information at guampowerauthority.com or on GPA’s Facebook page.

Monday, March 8, 2021

Scheduled Outage Notice for: Ipan, Talofofo Area on Thursday, 11 March 2021

Re: Scheduled Power Outage Notice
For Release: On Receipt
End Date: Thursday, 11 March 2021 @ 2:30 PM
 
The Guam Power Authority advises that a power outage is scheduled as follows:
 
Thursday, 11 March 2021
From: 9:00 AM – 2:30 PM (5.5 hours)
 
The area(s) affected include:  Ipan, Talofofo:  GWA Water Booster Pump-5, Country Club of the Pacific Golf Course.
 
REASON: GPA crews will be performing maintenance work to improve power quality and reliability.
 
In addition, there will be two (2) 30-minute interruptions of service for the following areas beginning once at 09:00 AM and again at 2:30 PM:
Location:  Cruz Heights and going north on Route 4 all the way to the Country Club of the Pacific Golf Course
 
Customers using backup generators, please ensure your main breaker is in the OPEN position to ensure the safety of the GPA crews working on the lines.
 
GPA regrets the inconvenience caused to customers in these areas, but the outage is necessary as a safety precaution while the GPA crews are performing this work.
 
Your cooperation is appreciated.
 
# # #

 

Editor’s note: customers may view this power outage information on GPA’s Facebook page.

Friday, March 5, 2021

Scheduled Power Outage Scheduled for: Route 16 Macheche Area on Wednesday 17 March 2021


Re: Scheduled Power Outage Notice
For Release: On Receipt
End Date: Wednesday, 17 March 2021 @ 2:00 PM
 
The Guam Power Authority advises that a power outage is scheduled as follows:
 
Wednesday, 17 March 2021
From: 10:00 AM – 2:00 PM (4 hours)
 
The area(s) affected include:  IHP Clinic, Laundry Basket, H&R Block, Larkin Chiropractic, Buddy Rental, HPS Clinic, Jang Su Restaurant, I Love Pho Restaurant, Luck Nails, Destiny Restaurant, CostULess, Shirley’s Restaurant, Korean Church and customers within the surrounding areas.
 
REASON: GPA crews will be removing a large tree grown over main power lines to prevent damages to power lines, prevent power outages and improve power quality.
 
In addition, there will be two (2) 30-minute interruptions of service for the following areas beginning at 10:00 AM and again at 2:00 PM:

Location:  Westbound on Route 27 Harmon Loop Road from Tsang Brothers to the Route 16 intersection; Northbound on Route 16 from the intersection of Route 16 and Route 27 to the Micronesia Mall; and the intersection of Route 16 to Route 27A Fatima Road (both the left and right side of Fatima Road)and customers within the area.
 
Customers using backup generators, please ensure your main breaker is in the OPEN position to ensure the safety of the GPA crews working on the lines.
 
GPA regrets the inconvenience caused to customers in these areas, but the outage is necessary as a safety precaution while the GPA crews are performing this work.
 
Your cooperation is appreciated.
 
# # #
 
Editor’s note:
customers may view this power outage information on GPA’s Facebook page.

Friday, February 26, 2021

Scheduled Outage Notice for: Area in Talofofo Village - Wednesday, 03 March 2021

For Release: On Receipt
End Date: Wednesday, 03 March 2021 @ 2:30 PM
 
The Guam Power Authority advises that a power outage is scheduled as follows:
 
Wednesday, 03 March 2021
From: 09:00 AM – 2:30 PM (5.5 hours)
 
The area(s) affected include:  Talofofo – Yona intersection of Route 17 and Route 4, including Water Booster Pump-5.
 
REASON: GPA crews will be clearing hazardous vegetation from main power lines and repairing power line hardware to improve power quality and reliability.
 
Customers using backup generators, please ensure your main breaker is in the OPEN position to ensure the safety of the GPA crews working on the lines.
 
GPA regrets the inconvenience caused to customers in these areas, but the outage is necessary as a safety precaution while the GPA crews are performing this work.
 
Your cooperation is appreciated.
 
# # #
 
Editor’s note: customers may view this power outage information on GPA’s Facebook page.